news

Information publicity of post environmental impact assessment report of Hangzhou Yibang Rubber Co., Ltd. (formerly Hangzhou Zhechen Rubber Co., Ltd.)

Hangzhou Yibang Rubber Co., Ltd. (formerly Hangzhou Zhechen Rubber Co., Ltd.)

Information publicity of post environmental impact assessment report

1、 Basic information of the construction project

Project name: Environmental Impact Post Assessment Report of Hangzhou Yibang Rubber Co., Ltd. (formerly Hangzhou Zhechen Rubber Co., Ltd.)

Project construction site: No. 1388, Jingliu Road, Linjiang Hi tech Park, Xiaoshan, Hangzhou

Industry category: synthetic rubber manufacturing C2652

Construction scale: With the original business scope unchanged and the product variety unchanged, the project of Hangzhou Yibang Rubber Co., Ltd. (formerly Hangzhou Zhechen Rubber Co., Ltd.) with an annual output of 100000 tons of styrene butadiene rubber will be continued by using the original land, real estate, machinery and equipment and other assets in the production area.

2、 Distribution of main environmentally sensitive targets within the scope of environmental impact assessment

Serial No

Point position

coordinate

Leaving factory boundary

Nearest distance

Relative position

Scale of sensitive points

Remarks

E

N

1

surface water

environment

Nanxin River

/

/

25m

north side

The river width is 37.7m

The river width is 25m

Straight river of Section XIII

/

/

25m

south side

The river width is 25m

seawater

environment

Section near the drain outlet

(Sea water Class III area)

/

/

10km

Southeast

large

Class III sea water quality standard

2

Air

Environment

Farm No. 1 Farm No. 2 General Yard Department

120.598

30.285

2200m

Northwest

20~30 office workers

Secondary air quality standard

Linjiang Jiayuan

120.589

30.286

2800m

Northwest

929 households, 2280 people

East Yuhua Court

120.595

30.286

2500m

Northwest

1748 households

Linjiang Kindergarten

120.589

30.286

3000m

Northwest

9 classes, about 300 teachers and students

Nanqin Apartment

120.585

30.263

2100m

Southwest

Five buildings in total

Jihua dormitory building (shift)

120.598

30.267

820 m

West side

Three buildings in total

Linjiang New Town Experimental Primary School

120.595

30.289

2700 m

Northwest

17 teaching classes, 646 students, 52 teaching staff

Linjiang Village

120.564

30.310

6300 m

Northwest

925 households, 3368 people

Linjiang Sub district Office

120.598

30.241

2700 m

Southwest

20~30 office workers

Changbei Village

120.581

30.225

5100 m

Southwest

557 households, 1944 people

Sanheng · Linjiang Era

120.590

30.291

3100 m

Northwest

443 households

Linjiang Dongfeng Yulong Dormitory

120.589

30.292

3200 m

Northwest

4 buildings in total, each with 18 floors

Linjiang People's Hospital

120.596

30.291

2700 m

Northwest

Covering an area of 11 mu, the building area is 12300 square meters

Rundong Mansion

120.588

30.293

3200 m

Northwest

276 households

Fulida Company Staff Apartment

120.587

30.294

3500 m

Northwest

5 buildings in total, each with 4 floors

Hengyi Apartment

120.589

30.297

3600 m

Northwest

6 buildings in total, each with 12 floors

Jianghai Times Garden

120.587

30.297

3800 m

Northwest

5 buildings in total, 33 floors each

Double Rabbit Apartment

120.591

30.300

3900 m

Northwest

4 buildings in total

Linjiang Industrial Park

Blue collar apartment

120.588

30.297

3700 m

Northwest

5 buildings in total

Xiaoshan Chuanghui Kindergarten

120.591

30.295

3500 m

Northwest

550 young children

3

risk

environment

Farm No. 1 Farm No. 2 General Yard Department

120.598

30.285

2200m

Northwest

20~30 office workers

Risk Level I

evaluate

Linjiang Jiayuan

120.589

30.286

2800m

Northwest

2280 people, 929 households

East Yuhua Court

120.595

30.286

2500m

Northwest

1748 households

Linjiang Kindergarten

120.589

30.286

3000m

Northwest

9 classes, about 300 teachers and students

Nanqin Apartment

120.585

30.263

2100m

Southwest

Five buildings in total

Jihua dormitory building (shift)

120.598

30.267

820 m

West Side

Three buildings in total

4

soil

environment

Jihua dormitory building (shift)

120.598

30.267

820 m

West Side

Three buildings in total

GB366 shall be implemented in residential areas

Screening value of the first type of land in 00-2018

Cultivated land

/

/

365 m

East Side

/

Cultivated land, in accordance with GB156

Filter values in 18-2018

290 m

South Side

5

groundwater
environment

Within 20km2 in and around the plant

Not used as drinking water source

groundwater

Class IV standard

6

Acoustic environment

None (the nearest sensitive point is Jihua dormitory building 820m to the west)

Acoustic environment

Category 3 standards

 

3、 Prediction of main environmental impacts

        (1) Waste gas: main air pollutants of Yibang Rubber are nitrogen oxides, styrene, butadiene, non methane hydrocarbon, ammonia and hydrogen sulfide. Waste gas is discharged into the air in the form of organized emission and unorganized emission.

        (2) Waste water: The waste water produced by Yibang Rubber mainly includes production waste water, tank farm drainage, laboratory waste water, equipment and ground flushing waste water, initial rainwater, steam condensate, waste water from demineralized water preparation system, waste water from cooling circulating system and domestic sewage. The average daily output of waste water is 1893.9t/d, and the annual output is 625000t/a. The main characteristic pollutant in the waste water is styrene.

        (3) Noise: The equipment with large sound pressure level in the plant is mainly concentrated in public works. The noise generated by the cooling tower can reach 90~95dB, that of other water pumps, vacuum pumps and mixers is 80~85dB, and that of air compressors and refrigeration units is 95~100dB. Water pump, vacuum pump and air compressor are arranged in each production workshop.

        (4) Solid wastes: The solid wastes generated in this project mainly include large rubber granules, TBC waste resin, sludge from sewage pretreatment station, waste packaging bags of raw and auxiliary materials, waste paint buckets, waste engine oil, waste reagents (solvents), waste reagent bottles, waste liquid samples from laboratories, waste lamp tubes/cannons, waste self polymers (waste resins), domestic garbage, etc. Except for RTO waste fillers, waste insulation materials and domestic garbage, they are all hazardous wastes.

 

4、 Main environmental protection measures to be taken, environmental risk prevention measures and expected effects

        (1) Waste gas: butadiene recovery tail gas is absorbed by kerosene absorption tower and then sent to the pilot burner of the flare system for incineration; The exhaust gas from the condensation tank and washing tank of the project is collected and sent to the alkali liquor spraying+RTO incineration treatment together with the exhaust gas from the drying oven of the drying unit, and then discharged by the 25m high exhaust funnel; The waste gas from the sewage treatment station is discharged through an 18m exhaust funnel after being treated by the process of "alkali liquor spraying+plant liquor spraying+photo hydrogen ion purification".

        (2) Waste water: At present, the plant has built a collection system for the separation of clean sewage and rain sewage, and the steam condensate and cooling water in the plant are recycled. The mixed sewage is taken over and sent to Linjiang Sewage Treatment Plant for treatment after being treated by neutralization tank, oil separation tank, central regulation tank, cyclone reactor, flotation tank, hydrolytic acidification tank, contact oxidation tank and secondary sedimentation.

        (3) Noise: The general layout of Yibang Rubber is reasonable, and the high noise equipment shall be placed in the middle of the plant and the workshop as much as possible; Low noise equipment shall be selected for circulating water pump, air compressor, fan, etc., and shock absorption device and sound insulation cover shall be installed. Silencers shall be installed in air inlet duct and exhaust duct; Fan room is set for the fan of the sewage station in the plant area; Louver sound barrier is used at the lower part of the cooling tower fan, and floating grid is set on the water surface; The diameter of concrete silencing wall is set around the flare system Ф 16m, 5m high; The production workshop is a closed structure, and the doors and windows are not opened under daily operation. The plant area has been afforested to a certain extent. The workshop has established various equipment operation management systems to ensure the normal operation of equipment.

        (4) Solid waste: a standardized temporary storage room for hazardous solid waste has been built in the existing plant area, and the construction of hazardous solid waste storage sites can meet the requirements of the Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001). At present, as the enterprise is in the recovery and maintenance stage, all kinds of production solid wastes have not been produced, but the entrusted disposal contract has been signed with the hazardous waste disposal unit through negotiation, and the disposal agreement is planned to be signed before the recovery. All hazardous wastes will be treated according to the requirements for hazardous waste management and disposal. RTO waste filler and waste insulation materials are only produced during the current maintenance, and will not be replaced in the future, and will be recycled by the maintenance unit.

5、 Preliminary conclusion of environmental impact assessment

As long as the construction unit effectively implements the pollution prevention measures proposed in this EIA, the Project will have little impact on the surrounding water environment, atmospheric environment and noise. It is feasible from the perspective of environmental protection.

6、 Scope and main issues for public comments

The scope of soliciting opinions mainly refers to enterprises and village residents around the project. The relevant public can express individual or group opinions in writing, and suggest that individuals should fill in their names and contact information truthfully, and units should fill in their contact addresses truthfully and affix their official seals to facilitate future communication.

7、 Time limit for soliciting public opinions

Information publicity of post environmental impact assessment report of Hangzhou Yibang Rubber Co., Ltd. (formerly Hangzhou Zhechen Rubber Co., Ltd.)

If the public has questions or comments on the environmental issues of the project, please contact the construction unit, environmental assessment unit or environmental protection authority within ten working days (excluding holidays) from the date of this announcement, that is, from March 23, 2020 to April 3, 2020.

8、 Public feedback approach

After the relevant information is released, the public may submit comments to the construction unit or the environmental impact assessment institution, and the competent environmental protection administrative department responsible for approving the environmental impact report, by letter, fax, e-mail or other means according to the relevant publicity requirements.

    (1) Construction unit

Company name: Hangzhou Yibang Rubber Co., Ltd

Location: No. 1388, Jingliu Road, Linjiang High tech Park, Xiaoshan, Hangzhou Zip code: 311200

Legal representative: Lao Hongbo Contact name: Zhang Guodong Contact Tel.: 15824176405

         (2) EIA unit

Company name: Coal Technology Group Hangzhou Environmental Protection Research Institute Co., Ltd

Location: No. 288, Gongxiu Road, Xiaoshan District, Hangzhou

Contact Name: Xu Lingqun Contact Tel.: 0571-82754657 Postal Code: 311201

         (3) Project approval unit

Approved by: Qiantang New Area Branch of Hangzhou Municipal Bureau of Ecology and Environment

Tel.: 0571-82987912 (No. C22 environmental protection window)

Fax: 0571-82987920 Email: djdhjbh@163.com

Mailing address: Environmental Protection Window of Dajiangdong Office Service Center, No. 3899, Jiangdong Avenue, Dajiangdong Industrial Cluster, Hangzhou (No. C22)

 

 

 

 

Announcement issued by: Hangzhou Yibang Rubber Co., Ltd

Announcement time: March 23, 2020